Start while the layout is still flexible
Bring us the drawings, project address, and construction schedule. Early discussion helps coordinate equipment locations, duct routing, ventilation, and space needed for other trades.
Coordinate the stages of the job
Mechanical work moves through design and planning, rough-in, equipment and duct installation, and final setup. We can discuss the work needed at each stage and how it fits your inspection and construction schedule.
Keep scope and communication practical
Multi-unit projects and secondary suites need clear information about which systems serve each space. Share plan revisions and identify responsibilities early so pricing and installation can follow the actual project.
Helpful details for your enquiry
- Current architectural drawings
- Project address and number of units
- Construction stage and schedule
- Builder or owner contact details
Questions about new home ductwork packages
When should a builder contact you?
As early as practical, ideally while mechanical space and routing can still be coordinated in the drawings.
Do you work on garden suites?
Yes. Contact us with the plans and project location to discuss heating, ductwork, and ventilation requirements.