Bring the drawings into the conversation
Share the secondary suite layout, existing mechanical equipment, and project stage. Early planning helps identify supply and return-air routing, equipment space, and coordination with framing and other trades.
Define the package before work starts
We can discuss the ductwork areas included, connections to equipment, ventilation coordination, and the work needed from other trades. The quoted scope should reflect the actual secondary suite plans and site conditions.
Coordinate rough-in and finishing
Tell us which areas are open and when other trades are scheduled. Confirm project-specific permit and inspection requirements with the responsible professionals and local authority before the space is closed up.
Helpful details for your enquiry
- Current secondary suite drawings
- Photos of existing equipment and accessible ducts
- Project address and construction stage
- Your planned schedule and project contact
Questions about secondary suite ductwork packages
What is included in a secondary suite ductwork package?
The scope depends on the drawings and site conditions. We will discuss the supply and return ductwork, equipment connections, ventilation coordination, and any exclusions in the quote.
Can you work on a basement secondary suite project?
Yes, contact us with the drawings and project stage to discuss the mechanical scope. Project-specific permit and inspection requirements must be confirmed.
